- 1
-
● The e
- ● The earned value technique is a commonly used method of performance measurement. It integrates project scope, cost, and schedule measures to help the project management team assess project performance. If a project’s Schedule Performance Index(SPI=EV/PV
- B.less work was completed than was planned
- C.the cost overrun for work completed
- D.the cost under-run of performance to date
- 5
-
● SWOT
- ● SWOT analysis is a kind of risk identification method. If the project team chose the SO strategy, they should __(75)__. (75)A.make full use of the advantage and catch the opportunity
- B.overcome the weakness and catch the opportunity
- C.make full use of the advantage and reduce the threat
- D.overcome the weakness and reduce the threat
- are the four major activities of software configuration management. ①configuration identification&n
- bsp; ②statement report ③
- change control ④preparation of requirement
- document ⑤configuration auditing (73)A.①②③④ B.①②④⑤ C.①②③⑤ D.②③④⑤
- al area network communication protocol. The standard of Ethernet is __(72)__. (72)A.IEEE 802.1&n
- bsp; B.IEEE 802.2
- C.IEEE 802.3
- D.IEEE 802.11
- ● TCP/IP communication protocol contains four layers. From bottom to top, the four layers are __(71)__. (71)A.network interface layer, internet layer, transport layer and application layer
- B.internet layer, network interface layer, transport layer and application layer
- C.network interface layer, transport layer, network interface layer and application layer
- D.application layer, transport layer, internet layer and network interface layer
- A.风险识别&n
- bsp; B.定性风险分析
- C.定量风险分析
- D.风险应对
- ● 有关风险识别,以下说法不正确的是__(67)__。 (67)A.项目组全体成员参与风险识别
- B.识别范围覆盖了项目的整个生命周期
- C.风险管理计划是风险识别的输出
- D.识别过程中综合运用了多种风险识别的技术和工具