- A.Cost Variance
- B.Schedule Variance
- C.Earned Value
- D.Cost Performed Index
- A.Detailed design
- B.Test run
- C.Internal testing
- D.Contract signing
- 5
-
( )is used to model aggregates of information and the relationships these aggregates have to other.
- A.Data flow diagram
- B.Entity relationship diagram
- C.Sequence diagram
- D.Structure diagram
- A.system design and detailed design
- B.computer design and program design
- C.system design and hardware design
- D.computer design and detailed design
- A.①②③④
- B.①②③
- C.①②④
- D.①③④
- A.spreadsheet
- B.control instructions
- C.I/O operation
- D.data table