- A.a rough list of things that the proposed software ought to do
- B.a precise list of things that the proposed software ought to do
- C.a formal list of things that the proposed software must do
- D.an estimate of the resouroes (time, money, personnel, etc) which will be required to construct the proposed software
- A.The team did not create the estimate and estimating tales too long using that method
- B.The team did not create the estimate and a network diagram was not used
- C.The estimate is too long and should be created by management
- D.The project estimate should be the same as the customer's required completion date
- A.CPU, memory and disk
- B.CPU, input and output
- C.CPU, memory and ALU
- D.CPU, memory and I/O system
- A.202.130.0.0
- B.202.0.0.0
- C.202.130.191.33
- D.202.130.191.0
- A.承建单位
- B.建设单位
- C.监理单位
- D.分包单位
- A.programs
- B.memory
- C.space
- D.password
- A.监理日志
- B.监理规划
- C.专题监理意见
- D.备忘录
- A.文档的格式应统一
- B.监理单位在项目开发前应确定何时产生何种文档
- C.文档策略是监理单位主持制订的
- D.工程监理档案只能按时间顺序归档
- A.是实施总监理工程师领导的基本条件
- B.是统一下属意志不可少的领导艺术
- C.基本要素有信息传播者、信息接收者、信息内容、信息传播媒介和方式
- D.是监理机构人员之间传达、反馈项目情况及相关信息的过程
- A.环境安全和人员安全
- B.系统安全和电磁安全
- C.环境安全和设备安全
- D.系统安全和环境安全