- A.activity definition
- B.activity sequencing
- C.schedule control
- D.Schedule development
- A.a rough list of things that the proposed software ought to do
- B.a precise list of things that the proposed software ought to do
- C.a formal list of things that the proposed software must do
- D.an estimate of the resources (time,money,personnel,etc)which will be required to construct the proposed software .
- A.the earliest time
- B.The latest time
- C.The total time
- D.the free time
- A.Physical layer and link layer
- B.Network layer and transport layer
- C.Physical layer and network layer
- D.Transport layer and application layer
- A.监理单位
- B.承建单位
- C.建设单位
- D.建设单位与监理单位共同
- A.the practice of designing, building, and maintaining off-the-shelf software from prefabricated parts
- B.the practice of designing, building, and maintaining ad-hoc software without the use of formal methods
- C.the practice of designing, building, and maintaining reliable and cost-effective software using standard techniques
- D.the practice of designing, building, and maintaining fast and flexible software specifically for engineering applications
- A.信息化建设工程项目验收活动中形成的文件
- B.信息化建设工程项目实施中最终形成结果的文件
- C.信息化建设工程项目实施中真实反映实施结果的文件
- D.信息化建设工程项目竣工图表、汇总表、报告等
- A.监理专题会议不能由授权监理工程师主持
- B.监理工程师要认真做好会议记录,会议纪要由参会各方签认
- C.按照会议结果的落实原则,必须在会后24小内公布会议成果
- D.监理专题会议通常包括技术讨论会、紧急事件协调会、技术评审会等
- A.监理工作统计
- B.承建单位工作统计
- C.管理协调综述
- D.监理总评价
- A.受理承建单位项目验收报告
- B.根据承建单位的验收报告,提出工程质量检验报告
- C.组织工程项目预验收
- D.组织项目验收