- ●To determine whether or not the employee correctly understands the message, the project manager needs to(75). (75) A. reduce the filtering
- B. eliminate barriers
- C. obtain feedback
- D. use more than one medium
- ●Which of the following is not an input to quality planning? (73) . (73) A. scope statement
- B. regulations
- C. work results
- D. standards
- 5
-
●Performing (74) involves monitoring specific project results to determine if they compLy with relev
- ●Performing (74) involves monitoring specific project results to determine if they compLy with relevant quality standards and identifying ways to eliminate causes of unsatisfactory results. (74) A. quality planning
- B. quality assurance
- C. quality performance
- D. quality control
- ●Models drawn by the system analysts during the process of the structured analysis are(72). (72) A.PERTs
- B.EMV
- C.UMLs
- D. DFDs
- ●Which is the second layer from the bottom in Open System Interconnection Reference Model? (71). (71) A. Application
- B.Data link
- C.Network
- D.Session
- ●监理应具有的职业道德操守是(70)。 ①监理应在核定的业务范围内开展相应的监理工作 ②严格遵照执行监理合同 ③遵守建设单位的有关行政管理、经济管理、技术管理等方面的规章制度要求 ④在处理事务时,敢于坚持正确观点,实事求是,不惟建设单位的意见是从 (70)A.① &nb
- B.①②
- C.①②③
- D.①②③④
- ●(67)不属于工程监理验收报告必须包括的内容。 (67)A.工程竣工准备工作综述
- B.验收测试方案与规范
- C.监理工作流程
- D.验收测试结论
- ●以下关于监理资料整理、归档的叙述,不正确的是(69)。 (69)A.监理资料应在监理工作结束后统一整理归档
- B.监理档案的编制及保存应符合国家法律法规和标准规范的要求
- C.监理资料的管理应由总监理工程师负责,并指定专人具体实施
- D.监理资料应按时整理、真实完整、分类有序
- ●监理方在编制工程验收监理报告时,应重点说明(68)。 (68)A.工程竣工准备工作综述
- B.验收测试方案与规范
- C.验收测试结论与分析
- D.项目监理工作总结
- ●《计算机软件文档编制规范》(GB/T 8567-2006)是(66)标准。 (66)A.推荐性国家
- B.强制性国家
- C.推荐性软件行业
- D.强制性软件行业