- 正确
- 错误
- 正确
- 错误
- 正确
- 错误
- 正确
- 错误
- 正确
- 错误
- 正确
- 错误
- 正确
- 错误
- 正确
- 错误
- 正确
- 错误
- 正确
- 错误
- 正确
- 错误
- A.10m
- B.12m
- C.13m
- D.15m
- 正确
- 错误
- A.1~2倍
- B.2~3倍
- C.3~4倍
- D.4~5倍
- A.5~10mm
- B.10~15mm
- C.15~20mm
- D.20~25mm
- A.2%
- B.5%
- C.3%
- D.4%
- A.4%
- B.5%
- C.6%
- D.7%
- A.1~3
- B.3~5
- C.5~7
- D.7~9
- A.15%
- B.25%
- C.35%
- D.50%
- A.8m
- B.10m
- C.12m
- D.15m
- A.15%
- B.25%
- C.35%
- D.50%
- A.1
- B.2
- C.3
- D.4
- A.运钢筋→绑墙钢筋→绑底板钢筋→绑梁钢筋
- B.运钢筋→绑梁钢筋→绑底板钢筋→绑墙钢筋
- C.运钢筋→绑底板钢筋→绑梁钢筋→绑墙钢筋
- D.运钢筋→绑梁钢筋→绑墙钢筋→绑底板钢筋
- A.立外模并画线→绑扎外侧网片→绑扎内侧网片→绑扎拉筋→安放保护层垫块→设置撑铁→检查→立内模
- B.立外模并画线→绑扎内侧网片→绑扎外侧网片→绑扎拉筋→安放保护层垫块→设置撑铁→检查→立内模
- C.立外模并画线→绑扎外侧网片→绑扎拉筋→绑扎内侧网片→安放保护层垫块→设置撑铁→检查→立内模
- D.立外模并画线→绑扎内侧网片→绑扎拉筋→绑扎外侧网片→安放保护层垫块→设置撑铁→检查→立内模
- A.主梁筋→次梁筋→板钢筋
- B.主梁筋→板钢筋→次梁筋
- C.板钢筋→次梁筋→主梁筋
- D.板钢筋→主梁筋→次梁筋
- A.25%
- B.35%
- C.45%
- D.50%
- A.0.6
- B.0.7
- C.0.8
- D.0.9
- A.5d
- B.10d
- C.15d
- D.20d
- A.45°
- B.60°
- C.90°
- D.135°
- A.30°
- B.45°
- C.60°
- D.90°
- A.1
- B.2
- C.3
- D.4
- A.30°
- B.45°
- C.60°
- D.90°