单选

材料:

The Company should establish a safety and environmental protection policy which describes how the objectives will be achieved.The Company should ensure that the policy is implemented and maintained at all levels of the organization both ship based as well as shore based. 

If the entity who is responsible for the operation of the ship is other than the owner,the owner must report the full name and details of such entity to the Administration.The Company should define and document the responsibility,authority and interrelation of all personnel who manage,perform. and verify work relating to and affecting safety and pollution prevention.The Company is responsible for ensuring that adequate resources and shore based support are provided to enable the designated person or persons to carry out their functions.To ensure the safe operation of each ship and to provide a link between the company and those on board,every company,as appropriate,should designate a person or persons ashore having direct access to the highest level of management. 

The responsibility and authority of the designated person or persons should include monitoring the safety and pollution prevention aspects of the operation of each ship and to ensure that adequate resources and shore based support are applied,as required. 

The Company should clearly define and document the master's responsibility with regard to:implementing the safety and environmental protection policy of the Company;motivating the crew in the observation of that policy;issuing appropriate orders and instructions in a clear and simple manner;verifying that specified requirements are observed;and reviewing the SMS and reporting its deficiencies to the shore based management. 

The Company should ensure that the SMS operating on board the ship contains a clear statement emphasizing the Master's authority.The Company should establish in the SMS that the master has the overriding authority and the responsibility to make decisions with respect to safety and pollution prevention and to request the Company's assistance as may be necessary. 

问题:

The Company should ensure that the policy is implemented and maintained at all levels of the organization both ship based as well as shore based.The ORGANIZATION refers to ________.

  • A.IMO
  • B.SMS
  • C.the Administration
  • D.the construction of the Company
参考答案
您可能感兴趣的试题

In the author's opinion,________.

  • A.recklessness and willful misconduct have the same meaning
  • B.no one can tell the differences between recklessness and willful misconduct
  • C.it is not necessary to distinguish the differences between recklessness and willful misconduct
  • D.the recklessness and willful misconduct should be distinguished

________ is opposed to GOOD faith.

  • A.gross negligence
  • B.willful misconduct
  • C.intentional will
  • D.fundamental breach

This passage is most likely extracted from ________.

  • A.Guide to Port Entry
  • B.Notices to Mariners
  • C.Attachment to a Charter Party
  • D.Ocean Passage

For the London District Sea Pilots the upriver limit is ________.

  • A.London Bridge
  • B.just below Gravesend
  • C.an imaginary line from the Sealink ferry pier at Gravesend to Tilbury Passenger Landing Stage
  • D.a line running from Felixstowe across the mouth of the Thames outside the GOODwin Sands to Folkestone

材料:

The Port of London comprises the 147km of the tidal River Thames,and the enclosed dock system at Tilbury.The limits of the port are from Teddington to those territorial waters within a limit as follows:from Foulness Point(Essex)to Gunfleet old lighthouse to 51°26′36′′N,01°25′30′′E to Warden Point(Kent),excluded is any part of the port as defined in the Medway Ports Reorganisation Scheme 1968;River Lea or Bow Creek within the jurisdiction of the British Waterways Board;The Grand Union Canal and Regents Canal Dock.For London District River Pilots the upper limit is London Bridge and the down river limit is just below Gravesend. 

For the London District Sea Pilots the upriver limit is an imaginary line from the Sealink ferry pier at Gravesend to Tilbury Passenger Landing Stage and the lower limit is a line running from Felixstowe across the mouth of the Thames outside the GOODwin Sands to Folkestone. 

The Thames Barrier,built for the Greater London Council at Woolwich Reach to afford protection against tidal floods is now under control of the Thames Water Authority.It allows shipping to and from the upper areas of the Port of London to pass without restriction during periods of non-surge conditions.

Spanning 520m across the river,it comprises ten rising sector gates,of which four main gates for navigation have a width of 61m and two subsidiary gates have a width of 35m. 

问题:

 ________ does not belong to the Port of London.

  • A.River Lea or Bow Creek within the jurisdiction of the British Waterways Board
  • B.The Grand Union Canal and Regents Canal Dock
  • C.from Foulness Point(Essex)to Gunfleet old lighthouse to 51°26′36′′N,01°25′30′′E to Warden Point(Kent)
  • D.any part of the port as defined in the Medway Ports Reorganisation Scheme 1968

The body of the deceased seaman was recovered by ________.

  • A.the C/O
  • B.the Pilot
  • C.a salver
  • D.someone not mentioned

It can be concluded that the deceased seaman ________.

  • A.wore a lifejacket but lost it when overboard in the sea
  • B.committed suicide
  • C.dropped into the sea to catch the pilot ladder
  • D.was given instructions in detail before being sent to his station
¥

订单号:

遇到问题请联系在线客服

订单号:

遇到问题请联系在线客服