单选

● 在某企业承建的一个信息系统集成项目中,建设方注重交付时间和质量,承建方公司老总注重项目利润,质量监控部经理注重项目的质量,人力资源部经理注重项目人力使用效率。下列围绕项目干系人管理的叙述错误的是__(31)__。

(31)

  • A.各项目干系人的目标可能是相互矛盾的
  • B.在项目不同阶段,干系人的要求要有不同的优先级别
  • C.重点考虑客户要求,人力资源部经理意见可忽略
  • D.当质量、进度、成本目标发生矛盾时,项目经理要进行平衡
参考答案
您可能感兴趣的试题

● Documentation of a software package is normally produced for two purposes. One is to explain the __(71)__ of the software and describe how to use them. This is known as __(72)__ because it is designed to be read by the user of the software. The other purpose of documentation is to describe the software,s internal composition so that the system can be maintained later in its life cycle. Documentation of this type is known as __(73)__.

(71)

  • A.plans      
  • B.cost      
  • C.features      
  • D.schedules    (72)
  • A.system documentation        
  • B.user documentation
  • C.vender documentation         
  • D.product documentation    (73)
  • A.system documentation        
  • B.user documentation

● 某系统集成企业为做好项目配置管理,对配置库中的操作权限进行了以下定义:

(64)

  • A.①√,②×,③×,④√,⑤√     
  • B.①√,②√,③√,④×,⑤√
  • C.①√,②√,③×,④×,⑤√     
  • D.①×,②√,③√,④×,⑤×

● 某系统集成企业为做好项目风险管理,定义了如下图所示的风险管理过程,以及过程中的参与人员,按照风险管理的要求来说,下图空缺位置应该填写的内容是__(62)__。

(62)

  • A.①项目经理     ②风险规避   
  • B.①风险负责人   ②风险解决
  • C.①项目组成员   ②风险跟踪   
  • D.①风险管理小组 ②风险减轻
¥