Ships entering piracy risk areas must be aware of the risk of attack and should take appropriate measures to increase the level of surveillance(监督)and security on board and devise means of responding to attacks.A clear and comprehensive Ship Security Plan and the training of crews in security measures and response techniques are essential.Without clearly defined and rigorously practiced procedures,the risk of an uncoordinated response during the inevitable confusion of an attack increases the danger faced by those on board the ship.While a Ship Security Plan and crew training may not prevent an attack they should help reduce the risks if an attack takes place. 

  • Attacks by pirates or armed robbers pose an immediate threat to the safety of a ship and individual crew members.When responding to attacks,masters and crews should seek to minimize the risk to those on board and maintain effective control over the safe n
  • A.Safety of lives onboard and the control of the safe navigation of the ship are the priority considerations when making decisions in responding to attacks
  • B.A clear and comprehensive Ship Security Plan can be developed by notifying the appropriate authorities of piracy-related information
  • C.The risk of an uncoordinated response during the inevitable confusion of an attack could be decreased by clearly defined and well practiced procedures
  • D.The communication of piracy-related information is a useful mechanism for anti-piracy Actions
参考答案
您可能感兴趣的试题

The author implies that ________.

  • A.even by making use of modern instrument it is difficult to maintain safety in this area
  • B.mariners should take it easy when navigating in this area
  • C.modern instrument should be used to control the safety of navigation in this area
  • D.it is dangerous when navigating in this area

The person on the bridge or in the pilot house shall be those ________.

  • A.who are recommended
  • B.who are familiar with the navigation.management.Operation and safety control
  • C.who are directly involved in the navigation,management,operation and safety control
  • D.who have nothing to do with the navigation,management,operation and safety control

SHIPPING is referred ________ in this passage.

  • A.the operations of transportation of GOODs by sea
  • B.the procedures of marine transportation business
  • C.the management of marine transportation business
  • D.the vessels and ships

The real reason that caused the hydraulic steering system to fail was that ________.

  • A.no fuel line spare were available
  • B.the weather was deteriorating
  • C.the“O”rings fitted to the shuttle valve were of either the wrong type or a defective one
  • D.the thruster power unit failed

When the hydraulic steering system failed,________.

  • A.the hand steering system could still be used
  • B.the auto steering system could still be used
  • C.both hand and auto steering system were out of use
  • D.neither and steering system nor auto steering system was out of use

材料:

  • At 1800,the hydraulic steering system failed once again.The master realized he would require shore assistance to rectify the problem,and diverted towards Portland using the thruster to steer by.The weather at this time was south-south-west force 5.At abou
  • At 2155,with the weather deteriorating and no steering,the master contacted the Portland Coastguard and a“Pan pan”message was broadcast.A tow to Portland Harbor was arranged and she arrived alongside at 0240 the following morning.The subsequent investigat
  • A.the hydraulic steering system
  • B.the solenoid valve
  • C.the thruster driving unit
  • D.the hand steering

According to the passage,________.

  • A.the bow of the vessel parted the pier first
  • B.the stern of the vessel parted the pier first
  • C.the beam of the vessel parted the pier first
  • D.it can not be concluded which part of the vessel parted the pier first

It can be concluded that ________.

  • A.the vessel was lying portside along the pier
  • B.the vessel was lying starboardside along the pier
  • C.the vessel was lying at a buoy
  • D.the vessel was anchored
¥