单选

材料:

Early on 5 November 1996,the 140,086 tonnes deadweight Malaysian flag bulk carrier Giga 2 was nearing completion of discharge of a cargo of iron ore at No.2 discharge berth,Port KemblA、Due to the vessel's light condition,the unloader could not be positioned over No.1 hold,to remove the 1080 tonnes of cargo remaining in that particular hold.At the suggestion of the shift supervisor,ballast was pumped into No.4 hold,which was permissible under the vessel's operations manual.Pumping of ballast into No.4 hold commenced at 0530. 

  • After the lunch break,two terminal workers descended into No.5 hold,where the unloader was working,to clear iron ore from around the bottom of the forward spiral access ladder.The spiral ladder terminated at the top of the lower stool,six metres above the
  • A.the trim was too small
  • B.the trim was too big
  • C.the draft was too small
  • D.the draft was too big
参考答案
您可能感兴趣的试题

The author implies that ________.

  • A.even by making use of modern instrument it is difficult to maintain safety in this area
  • B.mariners should take it easy when navigating in this area
  • C.modern instrument should be used to control the safety of navigation in this area
  • D.it is dangerous when navigating in this area

The person on the bridge or in the pilot house shall be those ________.

  • A.who are recommended
  • B.who are familiar with the navigation.management.Operation and safety control
  • C.who are directly involved in the navigation,management,operation and safety control
  • D.who have nothing to do with the navigation,management,operation and safety control

SHIPPING is referred ________ in this passage.

  • A.the operations of transportation of GOODs by sea
  • B.the procedures of marine transportation business
  • C.the management of marine transportation business
  • D.the vessels and ships

The real reason that caused the hydraulic steering system to fail was that ________.

  • A.no fuel line spare were available
  • B.the weather was deteriorating
  • C.the“O”rings fitted to the shuttle valve were of either the wrong type or a defective one
  • D.the thruster power unit failed

When the hydraulic steering system failed,________.

  • A.the hand steering system could still be used
  • B.the auto steering system could still be used
  • C.both hand and auto steering system were out of use
  • D.neither and steering system nor auto steering system was out of use

材料:

  • At 1800,the hydraulic steering system failed once again.The master realized he would require shore assistance to rectify the problem,and diverted towards Portland using the thruster to steer by.The weather at this time was south-south-west force 5.At abou
  • At 2155,with the weather deteriorating and no steering,the master contacted the Portland Coastguard and a“Pan pan”message was broadcast.A tow to Portland Harbor was arranged and she arrived alongside at 0240 the following morning.The subsequent investigat
  • A.the hydraulic steering system
  • B.the solenoid valve
  • C.the thruster driving unit
  • D.the hand steering

According to the passage,________.

  • A.the bow of the vessel parted the pier first
  • B.the stern of the vessel parted the pier first
  • C.the beam of the vessel parted the pier first
  • D.it can not be concluded which part of the vessel parted the pier first

It can be concluded that ________.

  • A.the vessel was lying portside along the pier
  • B.the vessel was lying starboardside along the pier
  • C.the vessel was lying at a buoy
  • D.the vessel was anchored
¥

订单号:

遇到问题请联系在线客服

订单号:

遇到问题请联系在线客服