单选

( ) is the application of planned, systematic quality activities to ensure that the project will employ all processes to meet requirements.

  • A.Quality assurance
  • B.Quality planning
  • C.Quality control
  • D.Quality cost
参考答案
您可能感兴趣的试题

What does a CPI of 80% mean? ( ) .

  • A.As of now we expect the total pr gject cost of 80% more than planned
  • B.When the project is completed, we will have spent 80% more
  • C.Your project is only progressing at 80% of that planned
  • D.Your project is only getting 80 cents out of every RMB invested

Which of the following desdription is WRONG .about Wi-Fi? ( ).

  • A.Any standard Wi~Fi device. will work anywhere in the world with global operative set of standaeds
  • B.Now most laptops are built with wireless network adapters inside
  • C.One can connect Wi-Fi devices in ad-hoc mode for client-to-client connections without a router
  • D.Communications between two devices need the involvement of an access point with Wi-Fi

工程监理总结报告属于( )。

  • A.监理实施类文档
  • B.总控类文档
  • C.监理回复类文件
  • D.监理内部文件

以下关于监理单位沟通协调方法的叙述中,正确的是:( )。

  • A.监理专题会议由总监理工程师主持,也可由授权的监理工程师主持
  • B.监理专题会议定期召开,由建设方主持,监理单位汇报
  • C.监理例会由总监理工程师主持,会议纪要由建设方签认后分发
  • D.定期的监理月报不属于监理沟通协调的方法
¥