- A.The preliminary design is an internal document used only by programmers
- B.The preliminary design is the result of mapping product requirements info software and hardware functions
- C.The preliminary design of the product comes from the requirement specification
- D.The developers produce the preliminary design by defining the software structure in enough detail to permit coding
- A.Ahead of schedule
- B.Behind schedule
- C.On schedule
- D.Having not enough information provided
- A.identifying individual tasks for a project
- B.scheduling the start of tasks
- C.scheduling the end of tasks
- D.determining potential delays
- A.Amount of subcontract
- B.qualifications and abilities of sub-contractors
- C.responsibilities and obligations of sub-contractors
- D.the contents of the subcontract
- A.承建单位要求项目暂停实施,总监理工程师签发“停工令”
- B.由于出现项目质量问题,必须进行停工处理,总监理工程师签发“停工令”
- C.发生必须暂停实施的紧急事件,总监理工程师代表签发“停工令”
- D.发生需要停工事件,但建设方暂不允许项目暂停,总监理工程师不签发“停工令”
- A.star
- B.ring
- C.bus
- D.none of the above
- A.监理单位不能同时既做信息系统工程的监理,又做系统集成业务
- B.处理监理业务一定要有可靠的依据和凭证
- C.遵守建设方的有关行政管理、经济管理、技术管理等规章制度及要求
- D.处理实际监理事务中,要有大局观,要全面地分析和思考
- A.中标通知书
- B.未中标的投标文件
- C.工程批复
- D.承建单位内部管理文件
- A.工程建设情况总结
- B.工程验收测试结论与分析
- C.工程监理执行情况总结
- D.工程建设过程及成果
- A.防止数据丢失
- B.防止数据崩溃
- C.防止系统之间数据通信的安全脆弱性威胁
- D.防止数据被非法访问