单选

● Project Time Management includes the processes required to manage timely completion of the project, these processes interact with each other. (74) is following the process- Estimate Activity Durations. 

(74)

  • A.Develop Schedule    
  • B.Estimate Activity Resources
  • C.Define Activities                  
  • D.Sequence Activities
参考答案
您可能感兴趣的试题

● (73) is one of the techniques used for estimating activity durations. 

(73)

  • A.Analogous Estimating    
  • B.Precedence Diagramming Method (PDM)
  • C.Dependency Determination     
  • D.Schedule network Templates

● (75) is not the tool name for quality controlling used in the figure below. 

(75)

  • A.Cause and Effect Diagrams
  • B.Ishikawa Diagrams 
  • C.Fishbone Diagrams                                       
  • D.Scatter Diagram    

● The connection between two networks to form. an internet is handled by a machine known as a (71) . 

(71)

  • A.bridge    
  • B.client   
  • C.router              
  • D.switch 

● 以下不属于沟通协调一般原则的是 (69) 。

(69)

  • A.公平、公正、独立原则 
  • B.守法原则  
  • C.对等原则    
  • D.诚信原则

● 从监理的角度来分类,以下不属于监理总控类文档的是 (68) 。

(68)

  • A. 监理合同  
  • B. 监理工作总结  
  • C. 监理实施细则   
  • D. 监理规划

● 监理大纲是监理单位为了获得监理任务而编制的方案性文件, 其应由 (67) 批准。

(67)

  • A. 建设单位代表            
  • B. 总监理工程师 
  • C. 监理单位技术负责人      
  • D. 招标机构代表
¥

订单号:

遇到问题请联系在线客服

订单号:

遇到问题请联系在线客服