● 系统集成项目完成了需求分析阶段的工作并开发了原型系统,承建方应组织本方项目经理、建设方代表和相关干系人完成__(10)__工作。 

(10)

  • A.代码走查      
  • B.桌面检查   
  • C.同行评审       
  • D.阶段评审
参考答案
您可能感兴趣的试题

● Documentation of a software package is normally produced for two purposes. One is to explain the __(71)__ of the software and describe how to use them. This is known as __(72)__ because it is designed to be read by the user of the software. The other purpose of documentation is to describe the software,s internal composition so that the system can be maintained later in its life cycle. Documentation of this type is known as __(73)__.

(71)

  • A.plans      
  • B.cost      
  • C.features      
  • D.schedules    (72)
  • A.system documentation        
  • B.user documentation
  • C.vender documentation         
  • D.product documentation    (73)
  • A.system documentation        
  • B.user documentation

● 某系统集成企业为做好项目配置管理,对配置库中的操作权限进行了以下定义:

(64)

  • A.①√,②×,③×,④√,⑤√     
  • B.①√,②√,③√,④×,⑤√
  • C.①√,②√,③×,④×,⑤√     
  • D.①×,②√,③√,④×,⑤×

● 某系统集成企业为做好项目风险管理,定义了如下图所示的风险管理过程,以及过程中的参与人员,按照风险管理的要求来说,下图空缺位置应该填写的内容是__(62)__。

(62)

  • A.①项目经理     ②风险规避   
  • B.①风险负责人   ②风险解决
  • C.①项目组成员   ②风险跟踪   
  • D.①风险管理小组 ②风险减轻
¥