单选

 ● During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised (75)are necessary.

(75)

  • A. proceedings            
  • B. controls
  • C. forecasting’s           
  • D. prelibations
参考答案
您可能感兴趣的试题

● The (71) is a general description of the architecture of a workflow management system used by the WFMC, in which the main components and the associated interfaces are summarized. The workflow enactment service is the heart of a workflow system which consists of several (72).

(71)

  • A. waterfall model         
  • B. workflow reference model
  • C. evolutionary model          
  • D. spiral model    (72)
  • A. workflow engines         
  • B. processes
  • C. workflow threads          
  • D. tasks 

● 因承建单位违反合同导致工程竣工时间延迟,监理单位(63) 。关于信息工程实施合同中关于工期的叙述,不正确的是(64) 。

(63)

  • A.不承担责任           
  • B.承担全部责任
  • C.与承建单位共同承担责任     
  • D.承担连带责任    (64)
  • A.在合同协议书内应明确注明开工日期 
  • B.在合同协议书内应明确注明竣工日期
  • C.在合同协议书内应明确注明合同工期总日历天数
  • D.通过招标选择承包人的项目,其合同工期天数就是招标文件要求的工期天数

● 测试是信息系统工程质量监理的重要手段之一,这是由信息系统工程的特点所决定,测试结果是判断信息系统工程质量最直接的依据之一。在整个质量控制过程中,可能存在承建单位、监理单位、建设单位以及专业的测试机构对工程的测试。各方的职责和工作重点有所不同,下面关于各方进行测试工作的描述,(65)是错误的。

(65)

  • A.承建单位在项目的实施过程中,需要进行不断的测试,主要是保证项目的质量 
  • B.监理单位要对承建单位的测试计划、测试方案、测试结果进行监督评审,对测试问题改进过程进行跟踪,对重要环节,监理单位自己也要进行抽样测试
  • C.在重要的里程碑或验收阶段,一般需要委托专业的测试机构对工程进行全面、系统的测试,为了保证专业的测试机构的独立公正,监理方不能对专业的测试机构的测试计划和方案进行干预
  • D.建设单位也要对信息工程进行测试,以检查正在开发的信息系统是否满足自己的业务需求
¥