单选

As the ____of the goods was not strong enough to withstand the rough sea voyage, shipment was withheld at the last minute in order to give time for ____ improvement.

  • A.pack, packed
  • B.package, packing
  • C.package, packaging
  • D.packing, packaging
参考答案
您可能感兴趣的试题
¥

订单号:

遇到问题请联系在线客服

订单号:

遇到问题请联系在线客服