单选

When a tug is pulling on a hawser at right angles to the ship,and the pilot wants to come ahead or astern on the ship's engine,care must be taken that the pilot ______.

  • A.Does not break the towline
  • B.Does not get too much way on the vessel
  • C.Keeps a steady course so the towline will remain tight
  • D.Turns the ship toward the direction of pull
参考答案
您可能感兴趣的试题

______ has the ship?

  • A.How much hatches
  • B.How many hatch
  • C.How much hatch
  • D.How many hatches

How does the effect known as“bank suction”act on a single-screw vessel proceeding along a narrow channel ().

  • A.It pulls the stern toward the bank
  • B.It heels the vessel toward the bank
  • C.It pushes the entire vessel away from the bank
  • D.It pulls the bow toward the bank

Solid green arrows on the main body of a pilot chart indicate ______.

  • A.Prevailing wind directions
  • B.Prevailing ocean current directions
  • C.Probable surface current flow
  • D.Shortest great circle routes

When a tug is pulling on a hawser at right angles to the ship,and the pilot wants to come ahead or astern on the ship's engine,care must be taken that the pilot ______.

  • A.Does not break the towline
  • B.Does not get too much way on the vessel
  • C.Keeps a steady course so the towline will remain tight
  • D.Turns the ship toward the direction of pull

Certificate of Fitness for the Carriage of Liquefied Gases in Bulk shall be carried on board by ______.

  • A.gas carriers constructed on or after 1 July 1986
  • B.gas carriers constructed before 1 July 1986
  • C.All chemical tankers
  • D.oil tankers of 150 gross tonnage and above

If you have to jump in the water when abandoning a vessel,your legs should be ______.

  • A.spread apart as far as possible
  • B.held as tightly against your chest as possible
  • C.in a kneeling position
  • D.extended straight down and crossed at the ankles

During an abandonment or drill,the first person to arrive at the survival craft should ______.

  • A.pass out food and water to personnel
  • B.open the doors and start the sprinkler system
  • C.activate the emergency release handle
  • D.open the doors and prepare the craft for boarding
¥