单选

The tanks should then be ______ immediately after the measurements or cargo samples have been taken.

  • A.topped up
  • B.braced
  • C.tommed down
  • D.re-pressurized
参考答案
您可能感兴趣的试题

To determine which grades of cargo a tank vessel is permitted to carry you should ______.

  • A.Refer to the vessel's Certificate of Inspection
  • B.Examine the cargo tanks and fittings
  • C.Ask the terminal supervisor or his representative
  • D.Check the loading order

To allow for the rise or fall in tide and for change in draft of a tanker during cargo transfer,cargo hoses must be suspended with ______.

  • A.Slings or saddles placed at 25-foot(8 meter)intervals
  • B.Enough slack in their bight
  • C.Topping lifts and runners tied off to winches
  • D.All of the above

The transfer procedures required to be followed on tankers shall contain ______.

  • A.A list of each port of discharge
  • B.A line diagram of the vessel's transfer piping
  • C.A current crew list
  • D.The duties by name of each person in charge required for each transfer operation

The use of portable electrical equipment in the pumproom on tank barges is prohibited unless ______.

  • A.The pumproom is gas-free
  • B.Spaces with bulkheads common to the pumproom are either gas-free,inert,filled with water,or contain grade E liquid
  • C.All other compartments in which flammable vapors and gases may exist are closed and secured
  • D.All of the above

The shipping papers for the products being carried in your tanker are NOT required to contain the ______.

  • A.Exact quantity of the cargoes
  • B.Grades of the cargoes
  • C.Location of the delivery point(s)
  • D.Name of the consignee(s)

The person in charge on the vessel and the person in charge at the facility must hold a meeting before starting the transfer of oil.Who must decide to start the transfer ________.

  • A.The person in charge on the vessel
  • B.The person in charge at the facility
  • C.Both persons in charge
  • D.The person in charge of either place that is doing the pumping

The oil transfer procedures aboard a tanker transferring oil are NOT required to contain ______.

  • A.The name of each person designated as the person in charge of transfer
  • B.A line diagram of the vessel's oil transfer piping
  • C.Special procedures for topping off tanks
  • D.A description of the deck discharge containment system
¥

订单号:

遇到问题请联系在线客服

订单号:

遇到问题请联系在线客服