单选

There is nothing in this world constant butinconstancy. —SWIFT Project after project designs a set of algorithms and thenplunges into construction of customer-deliverable software on a schedule thatdemands delivery of the first thing built.?

In most projects, the first system built is(71)usable. Itmay be too slow, too big, awkward to use, or all three. There is no(72)but to startagain, smarting but smarter, and build a redesigned version in which theseproblems are solved. The discard and(73)may be done in one lump, or it may be done piece-by-piece. But alllarge-system experience shows that it will be done. Where a new system conceptor new technology is used, one has to build a system to throw away, for eventhe best planning is not so omniscient(全知的)as to get it right the first time.

The management question, therefore, is notwhether to build a pilot system and throw it away. You will do that. The onlyquestion is whether to plan in advance to build a(74), or topromise to deliver the throwaway to customers. Seen this way, the answer ismuch clearer. Delivering that throwaway to customers buys time, but it does soonly at the(75)of agony(极大痛苦)for the user, distraction for the builders while they do theredesign, and a bad reputation for the product that the best redesign will findhard to live down.

Hence plan to throw one away; you will,anyhow.

(71)

  • A.almost
  • B.often
  • C.usually
  • D.barely
参考答案
您可能感兴趣的试题

(75)

  • A.worth
  • B.value
  • C.cost
  • D.invaluable

(72)

  • A.alternative
  • B.need
  • C.possibility
  • D.solution

(73)

  • A.design
  • B.redesign
  • C.plan
  • D.build

(74)

  • A.throwaway
  • B.system
  • C.software
  • D.product

以下关于集成测试的叙述中,不确的是(67)

  • A.在完成软件的概要设计后,即开始制定集成测试计划
  • B.实施集成测试时需要设计所需驱动和桩
  • C.桩函数是所测函数的主程序,它接收测试数据并把数据传送给所测试函数
  • D.常见的集成测试方法包括自顶向下、自底向上、Big-Bang等

以下属于静态测试方法的是(66)

  • A.分支覆盖率分析
  • B.复杂度分析
  • C.系统压力测试
  • D.路径覆盖分析
¥

订单号:

遇到问题请联系在线客服

订单号:

遇到问题请联系在线客服