●关于项目的采购管理,下列说法中,(31)是不正确的。

(31)

  • ●关于项目的采购管理,下列说法中,(31)是不正确的。    (31)A.企业进行一些常规性的采购时可以直接从合格供应商名单中选取供应商
  • B.如果项目的建设方指定了固定品牌和型号的设备,那么承建方在采购设备时要遵从建设方的要求
  • C.政府或公益性组织在进行采购时必须使用公开招标的方式
  • D.在选择供应商的过程中可使用加权计算评分法,可以减少人为偏见带来的影响
参考答案
您可能感兴趣的试题

●You h

  • ●You have just taken control of a project in the middle of execution and need to learn who has approval authority for revisions in scope. (75)document provides this information.    (75) A. Resource assignment matrix   &n
  • B. Change control plan
  • C. Project charter             
  • D. Client organization chart

●Your project is behind schedule due to conflict between te

  • ●Your project is behind schedule due to conflict between team members. Having resolved the conflict, to get the project back on schedule, you should consider(74).    (74) A. crashing the schedule
  • B. performing resource leveling
  • C. conducting reverse resource allocation scheduling
  • D. utilizing the critical chair resources

  • ● An example of scope verification is (73).    (73) A. review the performance of an installed software module
  • B. managing changes to the project schedule
  • C. decomposing the WBS to a work package level
  • D. performing a benefit/cost analysis to determine if we should proceed with the project

● The TCP protocol is

  • ● The TCP protocol is a (72) layer protocol.    (72) A. physical  
  • B. network   
  • C. transport   
  • D. application

●The connection between two networks to form.

  • ●The connection between two networks to form. an internet is handled by a machine known as a (71).    (71) A. bridge    
  • B. server    
  • C. router    
  • D. switch
¥