单选

●五项任务需要分配到四种不同型号的机器上来执行。四种型号的机器分别有25、30、20和30台。五项任务的工作量分别是20、20、30、10和25,不能把第四类机器分配到第四项任务上。每项任务当中的每个工作量在执行时需占用任意型号的1台机器。各类机器分配到各项任务时所发生的单位成本如下表所示:

 

任务分配的最优分配方案中,总成本是(68)。

(68)A. 500   

B. 605   

C. 560   

D. 520

参考答案
您可能感兴趣的试题

●You h

  • ●You have just taken control of a project in the middle of execution and need to learn who has approval authority for revisions in scope. (75)document provides this information.    (75) A. Resource assignment matrix   &n
  • B. Change control plan
  • C. Project charter             
  • D. Client organization chart

●Your project is behind schedule due to conflict between te

  • ●Your project is behind schedule due to conflict between team members. Having resolved the conflict, to get the project back on schedule, you should consider(74).    (74) A. crashing the schedule
  • B. performing resource leveling
  • C. conducting reverse resource allocation scheduling
  • D. utilizing the critical chair resources

  • ● An example of scope verification is (73).    (73) A. review the performance of an installed software module
  • B. managing changes to the project schedule
  • C. decomposing the WBS to a work package level
  • D. performing a benefit/cost analysis to determine if we should proceed with the project

● The TCP protocol is

  • ● The TCP protocol is a (72) layer protocol.    (72) A. physical  
  • B. network   
  • C. transport   
  • D. application

●The connection between two networks to form.

  • ●The connection between two networks to form. an internet is handled by a machine known as a (71).    (71) A. bridge    
  • B. server    
  • C. router    
  • D. switch
¥