单选

●下面属于项目范围控制活动的是(38) 。

(38)

  • ●下面属于项目范围控制活动的是(38) 。    (38)A.对项目的绩效情况进行分析,确定是否偏离设定的范围基准
  • B.对详细的范围说明书进行评审,提交客户签字确认
  • C.与客户充分沟通以获取项目的详细需求
  • D.与客户开展审查或检查活动,判断工作和交付成果是否符合设定的标准
参考答案
您可能感兴趣的试题

●You h

  • ●You have just taken control of a project in the middle of execution and need to learn who has approval authority for revisions in scope. (75)document provides this information.    (75) A. Resource assignment matrix   &n
  • B. Change control plan
  • C. Project charter             
  • D. Client organization chart

●Your project is behind schedule due to conflict between te

  • ●Your project is behind schedule due to conflict between team members. Having resolved the conflict, to get the project back on schedule, you should consider(74).    (74) A. crashing the schedule
  • B. performing resource leveling
  • C. conducting reverse resource allocation scheduling
  • D. utilizing the critical chair resources

  • ● An example of scope verification is (73).    (73) A. review the performance of an installed software module
  • B. managing changes to the project schedule
  • C. decomposing the WBS to a work package level
  • D. performing a benefit/cost analysis to determine if we should proceed with the project

● The TCP protocol is

  • ● The TCP protocol is a (72) layer protocol.    (72) A. physical  
  • B. network   
  • C. transport   
  • D. application

●The connection between two networks to form.

  • ●The connection between two networks to form. an internet is handled by a machine known as a (71).    (71) A. bridge    
  • B. server    
  • C. router    
  • D. switch
¥