单选

●项目经理刚刚完成一个小项目的启动阶段,开始步入计划编制阶段,这时,公司主管经营的副总经理向项目经理索要项目预算和成本基准计划。该项目经理较恰当的回答是(60)。

(60)

  • ●项目经理刚刚完成一个小项目的启动阶段,开始步入计划编制阶段,这时,公司主管经营的副总经理向项目经理索要项目预算和成本基准计划。该项目经理较恰当的回答是(60)。    (60)A.可以在项目章程中找到项目预算,项目章程刚刚做完
  • B.在计划编制阶段完成之前,项目预算和基准计划是不能最终确定的
  • C.项目计划将不包括项目预算和基准计划,这是个小项目
  • D.在制定项目计划之前不可能完成估算
参考答案
您可能感兴趣的试题

●You h

  • ●You have just taken control of a project in the middle of execution and need to learn who has approval authority for revisions in scope. (75)document provides this information.    (75) A. Resource assignment matrix   &n
  • B. Change control plan
  • C. Project charter             
  • D. Client organization chart

●Your project is behind schedule due to conflict between te

  • ●Your project is behind schedule due to conflict between team members. Having resolved the conflict, to get the project back on schedule, you should consider(74).    (74) A. crashing the schedule
  • B. performing resource leveling
  • C. conducting reverse resource allocation scheduling
  • D. utilizing the critical chair resources

  • ● An example of scope verification is (73).    (73) A. review the performance of an installed software module
  • B. managing changes to the project schedule
  • C. decomposing the WBS to a work package level
  • D. performing a benefit/cost analysis to determine if we should proceed with the project

● The TCP protocol is

  • ● The TCP protocol is a (72) layer protocol.    (72) A. physical  
  • B. network   
  • C. transport   
  • D. application

●The connection between two networks to form.

  • ●The connection between two networks to form. an internet is handled by a machine known as a (71).    (71) A. bridge    
  • B. server    
  • C. router    
  • D. switch
¥

订单号:

遇到问题请联系在线客服

订单号:

遇到问题请联系在线客服