- A.Planned value
- B.Actual cost
- C.Earned value
- D.Cost variance
- A.WBS Creation
- B.Scope definition
- C.Project acceptance
- D.Scope verification
- A.Continue to search for an insurance company that would assume the risk
- B.Place special emphasis on the risk event to intensely manage that item and all interfacing items
- C.Play down the risk and the team will find a means of overcoming any failure
- D.Ignore the risk assessment because any assigned value is a point estimate which is never precisely the expected state of nature
- A.milestone
- B.work
- C.quality
- D.baseline
- A.全面计划的质量管理
- B.全面结果的质量管理
- C.全过程的质量管理
- D.全员参加的质量管理
- A.statement of work
- B.project planning
- C.baseline plan
- D.information system planning
- A.在系统经过试运行以后的约定时间,双方可以进行项目的最终验收工作
- B.对于中小型项目,可以将系统测试和最终验收合并进行,并对验收过程加以确认
- C.对于信息系统而言,最终验收标志着项目的结束和售后服务的开始
- D.项目最终验收合格后,应由承建方项目组撰写验收报告并提请建设方工作主管认可
- A.0.7
- B.1.4
- C.7
- D.28
- A.自制或外购决策
- B.合同类型的选择
- C.专家判断
- D.制订方案邀请书(RFP)
- A.列出要求变更的手续
- B.记录要求变更的事项
- C.描述管理层对变更的影响
- D.确定要批准还是否决变更请求