单选

● Project (69) Management includes the processes required to ensure thatthe project includes all the work required, and only the work required, tocomplete the project successfully.

t

  • A.Integration  
  • B.Scope  
  • C.Configuration  
  • D.Requiremen
参考答案
您可能感兴趣的试题

 ● The (75) process analyzes the effect of risk events and assigns a numerical rating to those risks. 

  • A.Risk Identification               
  • B.Quantitative Risk Analysis 
  • C.Qualitative Risk Analysis            .Risk Monitoring and Control 
¥

订单号:

遇到问题请联系在线客服

订单号:

遇到问题请联系在线客服