● On some projects, especially ones of smaller scope, activity sequencing, activity resource estimating, activity duration estimating, and (70) are so tightly linked that they are viewed as a single process that can be performed by a person over a relatively short period of time.

  • A.time estimating      
  • B.cost estimating
  • C.project planning     
  • D.schedule development
参考答案
您可能感兴趣的试题

 ● The (75) process analyzes the effect of risk events and assigns a numerical rating to those risks. 

  • A.Risk Identification               
  • B.Quantitative Risk Analysis 
  • C.Qualitative Risk Analysis            .Risk Monitoring and Control 
¥